Overview Quick Details
Standard:
ASTM, BS, GB
Standard2:
ASTM A106-2006, ASTM A53-2007, BS 1387, BS 4568, BS 31, BS EN10219, GB 3087-1999, GB/T 3091-2001
Grade Group:
10#-45#, 16Mn, A53-A369, Q195-Q345
Grade:
10#, 20#, 16Mn, A53(A,B), A106(B,C), Q235, Q345, Q195, Q195,Q235,Q345,16Mn,A53,ST37,A500,S235,S275,S355
Section Shape:
Round
Outer Diameter(Round):
21.3 – 273 mm
Place of Origin:
Hebei, China
Application:
Fluid Pipe
Thickness:
1.5 – 20 mm
Surface Treatment:
Galvanized
Certification:
Other
Technique:
Hot Rolled
Alloy Or Not:
Non-alloy
Secondary Or Not:
Non-secondary
Name:
grooved pipe coupling
Other Name:
grooved pipe fittings
Commodity:
Galvanized pipe
Round galvanised pipe:
DIA: 21.3-273MM
Zinc coating mass:
60-300G/M2
Payment term:
LC, TT.DP
TREATMENT:
PLAIN OR BEVELED END
HS CODE:
73063090
Supply Ability
Supply Ability:
1000 Ton/Tons per Month grooved pipe coupling
Packaging & Delivery
Packaging Details
grooved pipe coupling package:1. As per the client's requirement 2. It is plastic cloth inside the wrapped with woven cloth
Port
XINGANG PORT or any port in CHINA
Picture Example:
Online Customization
grooved pipe coupling
O.D:21.3mm-273mmW.T:1.5mm-20mmP/L:Xingang,China
Specification forgrooved pipe coupling
Commodity |
Galvanized pipe |
Round galvanised pipe |
DIA: 21.3-273MM |
SCAFFOLDING STEEL PIPE |
48.3mm*2.5 mm–3.5mm |
square steel pipe |
15*15mm——-600*600mm |
rectangle steel pipe |
10*15mm–600*800mm |
EMT galvanised pipe |
1/2"—4" |
IMC galvanised pipe |
1/2"—4" |
Wall thickness |
W.T: 1.5-20MM, |
Standard |
BS1387 ,BS 4568 ,BS EN39 ,BS 31 ,EN1139,BS 3601 ,BS EN10217 ,EN10219,EN10210,JIS G3452-2004 JIS G3445-2006 ,JIS G3444-2006,JIS C8305-1999 ASMT A53 ,ASTM A500,GB/T 3091-2008, API 5L,GB/T 13793 |
Grade |
Q195,Q235,Q345,16Mn,A53,ST37,A500,S235,S275,S355 |
Zn coating mass |
60-300G/M2 |
Application |
Boiler,transportation of oil, natural gas, gas, pressure pipe, pipe for ship, structure pipe etc. |
Inspection |
With hydraulic testing,eddy current and infrared test, SGS |
Packing |
IN BULK OR STEEL STRIP INTO BULK, IN BULK FIRST THEN PLASTIC CLOTH OUTISDE |
Production steps |
Round preparation-heating-hot perforation-the first cut-pickling-grinding- |
Lubrication-cold rolling-fat-solution heat-straightening-cutting-pickling- |
Inspection |
Payment term |
LC, TT.DP |
TREATMENT |
PLAIN OR BEVELED END |
Others |
1:Special design available according to requirement |
2:Anti-corrosion and high-temperature resistant with black painting |
Length |
FIXED LENGTH AND RANDOM LENGTH accord to client’s requirement |
HS CODE |
73063090 |
Picture forgrooved pipe coupling
sand blasting grooved steel pipe
Workflow—grooved pipe coupling
Packaging&shipping forgrooved pipe coupling
grooved end galvanised steel pipe
related :
grooved end galvanised steel pipe